If your system design is larger than 10 kW, please contact REC at 406-961-3001 for additional application requirements 和 information on systems before proceeding with this applicationAre you an existing REC Member?(必需) 是的 No 警报 Please contact us at (406) 961-3001 to become an REC member prior to completing this form.成员名(必需) 第一个 最后的 Member Account Number(必需) 电话(必需)电子邮件(必需) 邮寄地址(必需) 街道地址 地址线2 城市 状态 阿拉巴马州阿拉斯加美属萨摩亚亚利桑那州阿肯色州加州科罗拉多州康涅狄格特拉华州District of Columbia佛罗里达乔治亚州关岛夏威夷爱达荷州伊利诺斯州印第安纳州爱荷华州堪萨斯肯塔基州路易斯安那州缅因州马里兰麻萨诸塞州密歇根明尼苏达州密西西比州密苏里州蒙大拿内布拉斯加州内华达新汉普郡新泽西新墨西哥纽约北卡罗莱纳北达科他Northern Mariana Isl和s俄亥俄州俄克拉何马州俄勒冈州宾西法尼亚波多黎各罗德岛州南卡罗来纳南达科塔州田纳西州德州犹他州U.S. 属维尔京群岛佛蒙特州维吉尼亚州华盛顿西维吉尼亚州威斯康辛州怀俄明Armed Forces AmericasArmed Forces EuropeArmed Forces Pacific 邮政编码 Physical Address of Installation(必需) Same as 邮寄地址 街道地址 地址线2 城市 状态 阿拉巴马州阿拉斯加美属萨摩亚亚利桑那州阿肯色州加州科罗拉多州康涅狄格特拉华州District of Columbia佛罗里达乔治亚州关岛夏威夷爱达荷州伊利诺斯州印第安纳州爱荷华州堪萨斯肯塔基州路易斯安那州缅因州马里兰麻萨诸塞州密歇根明尼苏达州密西西比州密苏里州蒙大拿内布拉斯加州内华达新汉普郡新泽西新墨西哥纽约北卡罗莱纳北达科他Northern Mariana Isl和s俄亥俄州俄克拉何马州俄勒冈州宾西法尼亚波多黎各罗德岛州南卡罗来纳南达科塔州田纳西州德州犹他州U.S. 属维尔京群岛佛蒙特州维吉尼亚州华盛顿西维吉尼亚州威斯康辛州怀俄明Armed Forces AmericasArmed Forces EuropeArmed Forces Pacific 邮政编码 承包商名称(必需) 承包商的电话(必需)电工的名字 电工的电话应用程序类型(必需) Net metering – 1 kilowatts kW to 10 kW 大于10kw 安装类型(必需) Photovoltaic/Solar Array 风力涡轮机 Hydroelectric Turbine 其他 系统规模(必需) 静止逆变器静止逆变器 Make:(必需) 静止逆变器 Model:(必需) 静止逆变器 Capacity:(必需) 合规(必需)Check all that apply IEEE 1547 IEEE 929 UL 1741 Installation InformationEstimated Installation Date (mm/dd/yyyy)(必需) 月 一天 一年 Estimated In-服务 Date (mm/dd/yyyy)(必需) 月 一天 一年 Main 服务 Size (Amps)(必需) 一代Does Facility Have Backup 一代?(必需) 是的 No 代:(必需) 一代模型:(必需) 一代 Nameplate Output Rating:(必需) Transfer Switch: 手册 or 自动?(必需) 手册 自动 Backup 一代 InformationBackup 一代 Point of Connection:(必需) 电池备份Does this facility have battery backup?(必需) 是的 No 电池备份 Make:(必需) 电池备份 Model:(必需) 电池备份 Capacity:(必需) Lockable/Visible Disconnect断开评级:(必需) Disconnect Location:(必需) Interconnection Point:(必需) Interconnection Wire Size:(必需) Interconnection Breaker Size:(必需) 隐藏的For Ravalli Electric Use Only - Test Data:隐藏的REC Location Number: 隐藏的Transformer Size (kVA): 隐藏的Voltage at 服务 Prior to 一代 Online: 隐藏的Voltage at 服务 AFTER 一代 Online: 隐藏的Amperage Output of Inverter: 隐藏的Inverter Isolates 和 Shuts Down When Utility Power is Lost [Non-back feed]? 是的 No 隐藏的Inverter Resets 和 Re-energizes When Utility Power is Restored? 是的 No 隐藏的Approximate Reset Time: 隐藏的REC表号 & 阅读(旧): 隐藏的REC表号 [New]: 隐藏的Weather Conditions at Time of Test: Required InformationPrior to REC approval, REC requires the following: Engineering Deposit – An Engineering Deposit of $175 是必需的. The Engineering Deposit for 净计量 installations is necessary to cover cost of engineering staff time to review proposed system. Please remit payment in person at our office in Victor, or send it by mail to: Ravalli Electric Co-op 注意:净计量 钟兴西143号 维克多,MT 59875 Please make checks payable to Ravalli Electric Co-op 和 include the members name 和 account number in the memo line on the check. Completed 和 Signed Interconnection or 净计量 协议 – This document will be prepared by REC with the data provided herein by the Applicant, signed by both parties. 电力许可证- The Applicant will have to provide REC with an electrical permit as proof the installation will be or has been inspected by a government electrical inspector. One-Line Electrical Diagram – The one-line diagram outlines how the generation components will interconnect with REC's distribution system. Diagram shall show means of utility disconnect. The disconnect shall be accessible by utility personnel 和 clearly labeled marking the utility source 和 alternative renewable source. There shall be a label indicating that the line 和 load terminals could be energized in the open position. Supporting Documents – Photovoltaic Panel, Inverter, Battery spec sheets as applicable. Onsite Inspections – REC personnel will inspect, test 和 approve the installation before full operation is permitted. System must be operational prior to REC inspection. Electrical Permit Number Upload One-Line Electrical Diagram(必需) 在此删除文件或 选择文件 马克斯. 文件大小:499mb. Upload Supporting Documents(必需) 在此删除文件或 选择文件 马克斯. 文件大小:499mb. Customer Acknowledgment同意(必需) I hereby certify that, to the best of my knowledge, the information provided in this Application is true. I agree to abide by the Net-Metering 和/or Interconnection agreements 和 政策 set forth by Ravalli Electric Cooperative, 公司. 此外, I agree to become a member of Ravalli Electric Cooperative, 和 abide by 和 comply with all REC By-Laws, 政策, 规定, 利率时间表, 和 any written agreements as set forth by the REC Board of Trustees.Applicant Electronic Signature (Full Name)(必需) 隐藏的Cooperative Approval隐藏的Cooperative Approval[Final approval of the facilities is contingent upon the Applicant providing the information in Item G above 和 REC inspection of the facilities once installed.] The interconnection of the facility mentioned herein is approved.隐藏的REC System Engineer Signature (Full Name)(必需) 隐藏的笔记评论This field is for validation purposes 和 should be left unchanged.